Congratulations! The installation of the 1000ton gantry shears in Armenia has been completed

After one week of installation, the heavy duty 1000T gantry shear finally installed successfully and running under the guide of Teyun engineer in Armenia.

This heavy duty 1000T gantry shear is customized for our Armenia customer becuase of the high and strict requirements for the shear, and after 5 months producing and 1 month sea shipping, the 1000T gantry shear arrived at the customer’s site. As soon as the gantry shear arrived, Teyun assigned the engineer to help our customer to install and guide.With the cooperation of customers and workers, our engineers guided and completed the installation of the gantry shears within one week. After the trial operation, the customer was very satisfied.

     

For the gantry shear we have many models:320t, 400t,500t,630t, heavy duty 800T, 1000T,1250T and ect.If you are also interested in the gantry shear for cutting and recycling the scrap metal, you can contact us for the solution plan, we are trying to help you: [email protected].

 

14 Shares
facebook sharing button
twitter sharing button
linkedin sharing button
wechat sharing button
email sharing button
sharethis sharing button

Leave A Message

If you are interested in our products and want to know more details, please leave a message here,we will reply you as soon as we can.